Bid Extension: MAINTENANCE, SERVICE AND REPAIR FOR EMERGENCY BACK-UP GENERATORS AT VARIOUS DEVELOPMENTS CITYWIDE
- laboratory
Source: Socrata ·
<p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>SCOPE OF WORK </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>The scope of work includes quarterly and annual preventive maintenance and will also include any repair work needed to ensure the equipment is maintained in good order. NYCHA currently operates ninety-three (93) generators across our portfolio and will add one hundred and eighty-nine (189) generators over the course of the next two to three years. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>1. Quarterly and annual preventive maintenance. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(a) Establish a preventive maintenance schedule for quarterly and annual preventive maintenance. This schedule must be submitted prior to the upcoming quarter and approved by a NYCHA Administrator. Annual maintenance can be incorporated into one of the quarterly maintenance periods. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(b) All work shall follow the manufacturers specific equipment maintenance and service guidelines as per operating manuals. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(c) Whenever Generator Maintenance is performed, the service technician shall provide the Contract Administrator with a detailed preventive maintenance report detailing the work completed. This report will be submitted with the vendors invoice. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>2. Repair Work: </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(a) Prior to the commencement of Repair Work of equipment still covered by the manufacturers warranty, the Vendor or its subcontractor(s), must provide to the satisfaction of the Contract Administrator, a copy of its current certification by either Generac to repair a Generac generator, or Caterpillar to repair a Caterpillar generator. This requirement does not apply to the repair of any equipment that is no longer under warranty. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(b) The Vendor shall advise the Contract Administrator of any necessary repairs and an approximate cost to complete the repairs if those repairs fall outside of the Minor or Major Preventative Maintenance schedule. This is for work discovered or recommended while the vendor is performing either quarterly or annual maintenance. The Contract Administrator will review and approve all repair work proposals. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(c) Inspect, assess and repair generators as needed or upon request by a NYCHA Administrator or designated personnel. Any time a vendor is called out on a non-emergency basis to inspect, assess and repair a generator the vendor will submit a proposal for both the assessment and any repair work needed to include material. The proposal will be reviewed by the NYCHA Administrator. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(d) Any time a vendor is called out on an emergency basis to inspect, assess and repair a generator the vendor will submit a proposal for both the assessment and any repair work needed to include material. The proposal will be reviewed by the NYCHA Administrator. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>3. All labor rates will be based on either normal or overtime hourly rates plus overhead and profit. Normal working hours are from 8 AM to 4 PM; overtime hours are any hours worked outside normal working hours, weekends or holidays. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>4. The vendor must be able to sub-contract to the specific equipment manufacturer regarding any special repair work that cannot be completed by the vendor. This work will be performed and invoiced using the Allowance line item. NYCHA owns and operates General and Caterpillar generators. A full list will be included in Appendix K.</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>MINOR PREVENTIVE MAINTENANCE: For each Generator, perform four (4) Minor Preventative Maintenance visits annually, once per quarter. </span></span></p><ol style='list-style-type:lower-alpha'> <li><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>During each Minor Preventative Maintenance visit on each Generator, the Vendor shall perform typical generator maintenance in accordance with the O&M manual and with industry best practice, including but not limited to the following tasks:</span></span></li></ol><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(b) Cooling Systems: </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Visual inspection of radiator or heat exchanger for leaks, damage, and obstruction. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>ii. Check jacket water coolant level and take coolant sample for analysis. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iii. Test coolant for proper antifreeze percentage. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iv. Check jacket water heater for proper operation and adjust thermostat setting as needed. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>v. Inspect the condition of the radiator cap, gasket and sealing surface. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>vi. Visual inspection of water pump and cooling system gaskets for leaks. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>vii. Check belt tension and inspect for cracking and fraying if accessibility without disassembly permits. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>viii. Inspect pulleys for excessive wear and lubricate hub bearings as needed. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>ix. Inspect flexible water connections for cracking, leaking, and pliability. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>x. Tighten hose clamps as needed. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'> (c) Lubrication System. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Check and top off oil level. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>ii. Check for excessive crankcase blow-by with engine running. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iii. Visual inspection of front and rear crankshaft seals and lubrication system gaskets for leaks. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iv. Inspect oil hose and connections for cracking, leaks, and pliability. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>v. Take crank-case oil sample; testing should be as per manufacturers guidance by submitting sample to a qualified testing laboratory or using the Engine Manufacturers Supplied Test kit. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>vi. Consolidate the results of all Generator oil samples on a quarterly basis in the spread sheet form detailing findings. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'> (d) Inspecting Fuel System </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Inspect the gas pressure regulator and check for leaks. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>ii. Drain water from the water separator if applicable. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iii. Check gas line, Maxon valves and regulators for leaks. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iv. Check electronic governor connections and actuator. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>v. Inspect gas lines, Maxon valves and regulators for cracks, leaks, and proper line bracket support.</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'> (e) Starting System </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Top off electrolyte levels in batteries with distilled water. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>ii. Check and record battery charger/alternator for proper charge rate. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iii. Check for proper cranking termination upon starting. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iv. Clean and apply corrosion inhibitor to the terminals of lead acid batteries as needed. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>v. Tighten battery cable connections as needed. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>vi. Inspect and tighten starter motor, connections, and wiring. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>vii. Check and record battery voltage dip level during over crank test for minimum voltage required to maintain controls during start-up. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'> (f) Exhaust System </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Inspect flexible exhaust coupling for cracks, excessive leakage, broken, or missing hardware. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>ii. Inspect exterior of exhaust manifolds for oil/fuel slobbering (signs of wet stacking). </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iii. Inspect exhaust rain protection and exhaust outlet screening. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iv. Drain water in exhaust moisture traps. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'> (g) Air Intake System </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Inspect air filters for plugging and deterioration, clean if required. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>ii. Check all air intake piping for damage and loose connections. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iii. Inspect the air cleaner seal for pliability and sealing and clean if necessary. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iv. Inspect turbocharger for excessive endplay clearance (if accessible) and seal leakage. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>v. Walk around the inspection of complete Generator installation. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>vi. Inspect the Generator set vibration isolators. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>vii. Check for abnormal noise or vibration. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>viii. Re-check for oil and coolant leaks with engine running. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>ix. Check for proper operation of remote fan motors, thermostats, circulating pumps, and solenoid valves. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>x. Check inlet and discharge louvers for proper operation with engine running and stopped.</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'> (h) Control Panel </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Operational check of illumination and safety lamps. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>ii. Check electronic control panels for fault codes. Clear any unnecessary codes, notify customers of any code that needs to be addressed. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iii. Check proper operation of engine and generator instruments with generator running. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iv. Adjust governor control for optimum performance and frequency. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>v. Adjust voltage regulator for proper voltage. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>vi. Check for and tighten loose terminals on the generator and the Generator control panel. Check the tightness of relays in the generator control panel. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>vii. Inspect for excessive dirt accumulation and clean as needed. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>viii. Test auto-start system. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>ix. Test safety and pre-alarms on engine/generator control and annunciator panels. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>x. Check operation of automatic sync equipment with customer authorization. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>xi. Place generator online and check operation of transfer switches. This will be done only with the consent of the Technical Resources Department. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>xii. Upon Completion of Service reset all controls to automatic. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>xiii. Set circuit breaker to correct position. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>xiv. Check that gas valves are in the correct position. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>xv. Check that battery charger is on. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>xvi. Check out that the louver controls are on. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>xvii. Check that jacket water heater is on. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>xviii. Provide an electronic checklist confirming all items were completed along with recording any measurements, descriptions of conditions, run times, and any notes. The checklist should also include the name of the service technician and date. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'> (i) Gas Booster Pumps, Control Panels and Maxon Valves </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Check operations. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>ii. Service. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>iii. Repair and replace. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'> (j) Fire Safety Equipment </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Inspection and maintenance of gas Co2 detection systems. QEL Gas Monitoring System and detection devices and calibration, when necessary, as per manufacturers specifications in accordance with NFPA 12 and 1 RCNY 908-01 Chapter 900.</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'> (k) Ventilation Systems </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Inspect, maintain, repair, and/or replace components of generator room ventilation systems. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'> (l) Electric and/or gas heaters </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Inspect, service, maintain and repair electric and/or gas heaters within the generator room and/or Generator Enclosure, Gas Booster rooms, Electric Automatic Transfer Switch (ATS) rooms. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'> (m) Uninterrupted Power Source (UPS) </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Check operation, service and repair/replace as needed. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'> (n) Automatic Transfer Switches </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>i. Inspect and check operation. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>ii. Repair and/or replace as needed.</span></span></p><p> </p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>MAJOR PREVENTIVE MAINTENANCE: Once per year during a Minor Preventative Maintenance visit, the Vendor shall perform the following Major Preventative Maintenance tasks on each Generator: </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(a) Change engine oil and filters. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(b) Check and replace spark plug and wiring as needed. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(c) Change primary and secondary fuel filters. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(d) Properly dispose of waste oil and filters. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(e) Lubricate fan drive if accessible. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(f) Lubricate governor linkage. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(g) Lubricate generator bearing if accessible. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(h) Clean crankcase breather. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(i) Inspect & test ATS and tighten ATS lugs. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>(j) Provide an electronic checklist confirming all items were completed along with recording any measurements, descriptions of conditions, run times, and any note s. The checklist should also include the name of the service technician and date.</span></span></p><p> </p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>CERTIFICATIONS </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>All Vendor staff/technicians performing this work must be trained and certified by the Electrical Generating Systems Association (EGSA) or a comparable certification in reference to this work.</span></span></p><p> </p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>TERM: 3 years plus two one-year extensions (at the discretion of NYCHA).</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>Section 3 and M/WBE: Please be advised that the Section 3 REO & OEO Plans and the M/WBE Utilization Plan & Waiver and other related documentation must be uploaded via eComply, https://nycha.ecomply.us/. Do not include Section 3 or M/WBE documentation within your bid submission via iSupplier. For assistance with eComply log-in, please contact eComply Tech support at support@ecomplysolutions.com. For assistance with M/WBE Utilization Plan and Section 3 REO/OEO Plan submission in eComply, please contact NYCHAs SMP Vendor Diversity team at eComply.support@nycha.nyc.gov<u>.</u> </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>Pre-Bid Conference. A non-mandatory virtual Pre-Bid Conference will be held on July 29th, 2025 at 10:00 AM and will be conducted remotely via Microsoft Teams meeting. Although attendance is not mandatory at the Pre-Bid Conference, it is strongly recommended that all interested Bidders attend, and that Bidders thoroughly review bid documents in advance of the meeting. </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>To participate in the Pre-Bid Conference, please follow the instructions below:</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>Microsoft Teams Meeting</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>Join on your computer or mobile app: click to join meeting</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>Option 1: Copy and paste the below in browser:</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzlkMGU4NDUtOGI1MC00YThmLTg5MTktZmYzMWI5MzM3YzMw%40thread.v2/0?context=%7b%22Tid%22%3a%22709ab558-a73c-4f8f-98ad-20bb096cd0f8%22%2c%22Oid%22%3a%22d3ad4d7d-b23c-46b6-a970-2e5863640413%22%7d </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>Meeting ID: 243 195 727 904 7 Passcode: D6AZ2H6m</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>Option 2: Call in (audio only) +1 646-838-1534,,46125460# United States, New York City</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>Phone conference ID: 461 254 60#</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>RFQ Timeline:</span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>RFQ Question Submission Deadline 8/8/25 at 2:00PM </span></span></p><p><span style='font-size:12pt'><span style='font-family:Aptos,sans-serif'>Question and Answer Release Date 8/15/25 at 2:00PM</span></span></p>
Key dates
Response due
October 16, 2025
- Posted
- July 22, 2025
Details
- Buyer
- Housing Authority
- Agency
- Housing Authority
- Buyer type
- County
- Jurisdiction
- New York (NY)
- Category
- Clinical
- Value
- —
- Set-aside
- —
- NAICS
- —
- PSC
- —
- Source
- socrata
Who is this buyer
Organization
Source: Provider universeNot matched to a provider record yet.
Buying history
Source: Solicitation records- Records6 total
- Opportunities / awards6 / 0
- ActiveJuly 22, 2025 – August 11, 2026
What they buy
- Insurance (3)
- Clinical (2)
- Administrative (1)
Financial highlights
Source: IRS Form 990No 990 filing on record.
Who holds their work today
Source: Solicitation records · awardsNo awards on record for this buyer.
What they're trying to solve
Source: AI-generatedNo brief written for this buyer yet.
Also open from this buyer
Source: Solicitation records- Process Mining and Process IntelligenceDue August 18, 2026 · Insurance · Socrata
- Process Mining and Process IntelligenceDue August 18, 2026 · Insurance · Socrata
Ways to meet this buyer
Source: Solicitation records · event noticesUpcoming
No upcoming events on record.
Source link on socrata.