Request for Proposal Professional Consulting Services for Feasibility Study for Former Canada Post Office Tower - 266 Graham Ave.
- facilities
- consulting
- construction
Source: Socrata ·
Full Title: Professional Consulting Services for Feasibility Study for former Canada Post Office Tower - 266 Graham Ave.<br /><br />D3. SCOPE OF SERVICES<br /><br />D3.1 The City of Winnipeg wishes to occupy or lease the vacant portions of the former Canada <br />Post Office Tower (the ‘Tower’) located at 266 Graham Avenue. While tenants have not been <br />finalized, the expectation is that future occupants will include personnel from selected City <br />Departments. The purpose of this study is to:<br />(a) Gain a better understanding of the necessary Work and associated costs prior to occupancy of <br />the Tower;<br />(b) Provide the City of Winnipeg with a plan to strategically address the maintenance and <br />improvement projects on a priority basis;<br />(c) Assist in the preparation of present and future repair and maintenance budgets;<br />(d) Identify the minimum Work required and related costs in preparation for re-occupancy of the <br />Tower;<br />(e) As the Tower has been mostly vacant for a prolonged period, it is necessary to determine the <br />extent of remedial Work required throughout the building prior to occupancy and any new tenant, the <br />City is seeking a comprehensive building condition assessment (BCA), along with recommendations for <br />maintenance, repairs and upgrades, and related construction cost estimates;<br />(f) Historically, the most common major occupancy classification within the Tower has been Group <br />D (Office). It is anticipated that future occupancies within the Tower will again be comprised of <br />Group D occupancies. It is NOT necessary to investigate additional occupancy classifications for <br />purposes of this assessment;<br />(g) Further to D3.1, the Consultant team is required to attend the Tower in order to accurately <br />assess and document observations of existing conditions. Since some areas within the Tower are <br />occupied by the WPS, consulting team personnel will be required to obtain and maintain WPS Level 2 <br />Security Clearance for the duration of the assignment. Pending security clearance, all available <br />drawings, including original construction documents, will be available for review.<br />(h) The Consultant shall prepare a detailed report comprised (at minimum) of the following <br />components:<br />(i) Executive Summary<br />(ii) Description of Assessment Methodology<br />(iii) Part A: Building Condition Assessment<br />(iv) Part B: Code Compliance Review<br />(v) Part C: Facility Renewal Plan<br />(vi) Part D: Class 3 Cost Estimates for required upgrades<br />(vii) Summary and Conclusions<br />(i) A draft copy of the complete report is to be submitted for review and feedback by City <br />personnel prior to the final deliverable.<br /><br />D3.2 PART A BUILDING CONDITION ASSESSMENT<br />(a) The Consultant is to perform a comprehensive Building Condition Assessment (BCA) of the <br />specified building. Investigation shall be through visual, non-destructive site reviews and review <br />of available documentation (drawings, specifications, maintenance history). The purpose of the BCA <br />is to facilitate a better understanding of the true extent of required upgrades prior to occupying <br />the Tower. Based on the age of the building and extended period of vacancy, many building systems, <br />components and finishes will have exceeded their expected lifespan. This is a common reality <br />among the City’s building inventory. The assessment must not merely conclude that building <br />components must be replaced simply because they have exceeded their expected lifespan. The <br />Consultant is expected to document observed conditions and provide informed opinions regarding a <br />realistic remaining lifespan of all building components.<br />(b) The assessment shall evaluate the existing condition of Architectural, Structural, Mechanical <br />and Electrical components, systems and services. Note that where systems and services are shared <br />or interconnected with WPSHQ, it will be necessary to evaluate areas occupied by the WPS. Access <br />to WPSHQ and/or WPSHQ construction documents requires WPS Level 2 Security Clearance. The <br />Proponent’s personnel shall acquire and maintain this security clearance for the duration of the <br />assignment.<br />(c) The content and format of the Building Condition Assessment shall be in conformance with<br />‘Protocols for Building Condition Assessment’ published by the National Research Council.<br /><br />D3.3 PART B CODE COMPLIANCE REVIEW<br />(a) It is understood that all applicable codes and standards have been updated and/or introduced <br />since the time of the Tower’s 1958 construction. For the purposes of this assessment, the <br />Consultant is to assume that intended future major Occupancies within the Tower shall be Group D.<br />(b) The report is to provide a comprehensive assessment with respect to compliance with present <br />codes and standards including:<br />i. Winnipeg Building Bylaw<br />ii. Manitoba Building Code<br />iii. National Fire Code of Canada<br />iv. National Plumbing Code<br />v. CSA C22.1 Canadian Electrical Code<br />vi. Winnipeg Accessibility Design Standards<br />(c) Similar to the Building Condition Assessment, the Consultant shall exercise professional <br />judgment and discretion in determining the feasibility of achieving compliance with current codes <br />or standards. The purpose of this Code Compliance Review is to identify existing conditions that <br />do not comply with current code(s) and the extent of upgrades required to achieve compliance. In <br />each case, the Consultant shall include applicable code reference(s).<br />(d) Compliance with the City of Winnipeg Accessibility Design Standards (CWADS) applies to all <br />City-owned and City-occupied spaces. The assessment shall identify any shortcomings related to <br />compliance with this standard. Compliance with CWADS is considered mandatory, and no exemptions or <br />legacy clauses (grandfather clauses) shall apply. Certain exemptions will be permitted where it is <br />“technically not feasible” to comply. In such cases, solutions based on ‘equivalent facilitation’ <br />may be proposed (CWADS: 2015, p. 25).<br />(e) While certain building code violations are likely to be permitted to continue under a <br />grandfather clause, these conditions that represent risks to occupant safety or health must<br />not be ignored. Remedial work to rectify these conditions is to be described in the Facility<br />Renewal Plan, complete with cost estimates.<br />(f) For each non-compliant condition, the Consultant is to determine:<br />i. The degree to which the condition represents a risk to occupant safety (if any);<br />ii. Whether the condition will be permitted to remain under a legacy clause in a <br /> re- occupied Tower. The Consultant will be required to provide a detailed assessment of such <br />conditions. In cases where the Winnipeg Building By-law is not clear, consultation and <br />clarification with the Authority Having Jurisdiction may be necessary;<br />iii. Class 3 estimate of the cost for upgrades necessary to achieve compliance <br />with present code – to be included in Part D. This estimate is to be included regardless of <br />whether a condition is likely to be permitted under legacy clause.<br /><br />D3.4 PART C FACILITY RENEWAL PLAN<br />(a) With findings from the Building Condition Assessment (Part A) and the Code Compliance Review <br />(Part B), the Consultant shall prepare a Facility Renewal Plan. The Plan is to include an <br />inventory of building components and systems along with an indication of their respective age and <br />condition. The assessment for each component shall include:<br />(i) Installation date (if available). If unknown, indicate the approximate age of each <br />component;<br />(ii) Estimated remaining service life. Beyond the date of installation and life expectancy, <br />this estimate should be informed by the present condition and maintenance history for each <br />component;<br />(iii) Anticipated cost for major repairs or maintenance. The Consultant is to identify and <br />prioritize repairs or maintenance expenditures based on degree of importance and long-term <br />cost/benefit evaluation. Recommendations for required repairs or maintenance work shall be <br />categorized as follows:<br />(i) Immediate (0 - 3 years). This includes mandatory work in order to comply with applicable <br />codes and standards<br />(ii) Short term (3 – 10 years)<br />(iii) Long term (10 years or more)<br />(b) Certain building upgrades will result in improved energy performance. In such instances, the <br />Consultant shall include an estimate of the proposed payback period for consideration. The <br />Consultant is to exercise professional judgment in recommending the cost-effective<br />(c) The Consultant is to exercise professional judgement in recommending the cost-effective <br />solutions for re-use of the Tower. Conclusions and recommendations are to be presented on a <br />floor-by-floor basis. For each floor of the Tower, the Consultant shall prepare an assessment for <br />both (2) two options as follows:<br /><br />Option One: Identify the minimum scope of Work required to occupy the floor.<br /><br />(a) Assume that the new tenant can partially or fully occupy the floor without substantial <br />renovation work.<br />(i) Floor layout and interior partitions to remain in place (refer to Appendix);<br />(ii) Existing finishes to remain in place, unless damaged, excessively worn, or otherwise <br />unsuitable;<br />(iii) Functional fixtures and equipment are to be re-used wherever possible;<br />(iv) Determine the maximum occupant load for Group D Occupancy based on floor area, exit <br />capacity and washroom fixture count. For purposes of this study, assume that occupants will have <br />access to only those washrooms on their own floor (i.e. tenants will not have access to ‘common’ <br />washroom facilities on other floors). For the 6th to 11th floors, it will be necessary to <br />construct additional washrooms.<br />(v) Include Universal Toilet Rooms (UTRs) on each floor to satisfy barrier free requirements;<br />(vi) For each floor, provide an inventory of the Work required; and<br />(vii) Provide estimated cost for this Work for each floor.<br /><br />Option Two: Identify the scope of Work for a complete retrofit of the existing floor to suit a new <br />tenant.<br /><br />(a) This scenario assumes that the existing interior layout is not conducive to the operations of <br />the new tenant and therefore the space will be entirely renovated.<br />(i) All interior partitions and finishes are to be demolished / removed;<br />(ii) Fixtures and equipment are to be replaced to support a new layout. Existing fixtures and <br />equipment that are serviceable and in good condition may be re-used;<br />(iii) For each floor, provide an inventory of items to be re-used;<br />(iv) Ensure appropriate consideration for abatement / encapsulation of asbestos containing <br />materials during demolition (refer to Appendix);<br />(v) New floor layout is to be based on a typical office occupancy including:<br />◻ open-area flexible workstations (tenant cost);<br />◻ two conference rooms (8 persons / 16 persons);<br />◻ multiple small ‘quiet’ rooms;<br />◻ two staff lunch rooms including small kitchenettes (no cooking);<br />◻ gypsum board partitions as necessary for secure elevator lobby;<br />◻ fire separations as necessary for separation of exits;<br />◻ Universal Toilet Rooms as required to supplement existing washrooms;<br />◻ HVAC upgrades as required;<br />◻ Total anticipated maximum occupant load per floor: 90 persons;<br />(vi) Provide an estimated cost for the cost for extensive retrofit as described for each floor.<br />(b) The Consultant is to exercise professional judgement in recommending the cost-effective <br />solutions for re-use of the Tower. Conclusions and recommendations are to be presented on a <br />floor-by-floor basis. For each floor of the Tower, the Consultant shall prepare an assessment of <br />(2) two options as follows:<br /><br />D3.5 PART D COST ESTIMATES FOR TENANT IMPROVEMENTS<br />(a) for ‘Base Building’ Improvements<br />(i) Consultant shall prepare detailed cost estimates for proposed maintenance, repairs and <br />upgrades as presented in the Facility Renewal Plan.<br />(ii) Provide separate Class 3 construction cost estimates for maintenance and repair work as <br />identified in Parts A and B, summarized in Part C Facility Renewal Plan:<br />◻ Provide separate Immediate (0 - 3 years). This includes mandatory work in order to comply with <br />applicable codes and standards<br />◻ Short term (3 – 10 years)<br />◻ Long term (10 years or more)<br />(iii) Costs in each estimate shall be presented in current construction market pricing (without <br />escalation). Present this information in a Table Format, as per the attached template.<br />(b) for ‘Tenant’ Improvements<br />(i) Provide Class 3 construction cost estimates for each Option One and Option Two: estimates <br />are to be broken down to identify the cost of work required for each floor (Main through 11th) for <br />each Option presented.<br />(ii) All cost estimates are to be prepared by a Professional Quantity Surveyor.<br />(iii) Class 3 Cost Estimate Classification shall be in accordance with AACE International <br />Recommended Practices (refer to hyperlink): <br />https://www.winnipeg.ca/finance/findata/matmgt/documents/2014/726- <br />2014/726-2014_ADDENDUM_1/726-2014_Addendum_1- Appendix_A_Cost_Estimate_Classification_System.pdf<br />D3.5.2 The Services required under D3 shall be in accordance with the City’s Project <br />Management Manual http://winnipeg.ca/infrastructure/asset-management- <br />program/templates-manuals.stm#2 and templates http://winnipeg.ca/infrastructure/asset- <br />management-program/templates-manuals.stm#4 . Notwithstanding the foregoing, the Consultant is being <br />engaged by the City for its professional expertise; the Consultant shall bring to the Project <br />Manager’s attention any aspect of the City’s Project Management Manual or templates which the <br />Consultant is of the opinion is not consistent with good industry practice.<br /><br />D3.6 The following shall apply to the Services:<br />(a) Universal Design Policy <br />http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=3604<br />D3.7 The funds available for this Contract are $120,000.00.<br /><br /><br /><br /><br /><br /><br />
Key dates
Response due
July 29, 2022
- Posted
- June 30, 2022
Details
- Buyer
- City of Winnipeg
- Agency
- City of Winnipeg
- Buyer type
- County
- Jurisdiction
- (MB)
- Category
- Administrative
- Value
- —
- Set-aside
- —
- NAICS
- —
- PSC
- —
- Source
- socrata
Who is this buyer
Organization
Source: Provider universeNot matched to a provider record yet.
Buying history
Source: Solicitation records- Records32 total
- Opportunities / awards32 / 0
- ActiveSeptember 23, 2020 – August 11, 2026
What they buy
- Administrative (25)
- Clinical (6)
- Insurance (1)
Financial highlights
Source: IRS Form 990No 990 filing on record.
Who holds their work today
Source: Solicitation records · awardsNo awards on record for this buyer.
What they're trying to solve
Source: AI-generatedNo brief written for this buyer yet.
Also open from this buyer
Source: Solicitation recordsWays to meet this buyer
Source: Solicitation records · event noticesUpcoming
No upcoming events on record.
Source link on socrata.