NEWPCC SBR Aeration Piping Modification and Repair
Source: Socrata ·
D2. SCOPE OF WORK<br /><br />D2.1 The Work to be done under the Contract shall consist of the repair and modification of <br />the existing aeration piping for NEWPCC SBR-1 and SBR-2.<br /><br />D2.2 The Contractor shall remove the existing wall mounted supports, fabricate and install <br />new wall mounted supports, re-slope the pipe and incorporate new expansion joints for each piping <br />loop. The Contractor shall further repair and reinstall the damaged aeration piping loop C located <br />in SBR-2. Damaged connections between the existing aeration piping and blower header shall be <br />repaired and reinforced or replace, adding new piping for crossover of flow between SBR-1 and SBR-2 <br />headers.<br /><br />Work shall first be completed on SBR-2 which must be fully operational before work can proceed to <br />SBR-1 which must then be decommissioned and cleaned by the City of Winnipeg prior to entry.<br /><br />D2.3 The major components of the Work are as follows:<br />(a) All work related to the refurbishment of aeration piping for Tank SBR-2<br />(i) Fabrication and installation of new wall mounted supports consisting of a series of fixed <br />and sliding supports to accommodate thermal movement as shown on the drawings.<br />(ii) Lifting, repairing and remounting of the damaged piping loop ‘C’ in SBR-2 as shown on the <br />drawings.<br />(iii) Re-sloping of aeration piping to facilitate drainage between cycles.<br />(iv) Supply and installation of expansion joints in the vertical legs of each piping loop.<br />(v) Fabrication and installation of reinforcement where aeration piping connects to the blower <br />header and replacement of sections of aeration piping as described on the drawings.<br />(vi) Modification of existing blower header, fabrication and installation of new crossover <br />piping and butterfly isolation valve as shown on the drawings.<br />(vii) Removal of existing jacket and insulation on the blower header and drop leg piping <br />sufficient to carry out the work. Insulate and install new jacket as required to restore the <br />existing areas of insulation and to protect the new crossover piping components.<br />(viii) Provision of all scaffolding, lifting equipment or other as required to carry out the <br />work.<br />(b) All work related to the refurbishment of aeration piping for Tank SBR-1<br />(i) Fabrication and installation of new wall mounted supports consisting of a series of fixed <br />and sliding supports to accommodate thermal movement as shown on the drawings.<br />(ii) Re-sloping of aeration piping to facilitate drainage between cycles.<br />(iii) Supply and installation of expansion joints in the vertical legs of each piping loop.<br />(iv) Fabrication and installation of reinforcement where aeration piping connects to the blower <br />header and replacement of sections of aeration piping as described on the drawings.<br />(v) Modification of existing blower header, fabrication and installation of crossover<br />piping and connection to butterfly isolation valve as shown on the drawings.<br />(vi) Removal of existing jacket and insulation on the blower header and drop leg piping <br />sufficient to carry out the work. Insulate and install new jacket as required to restore the <br />existing areas of insulation and to protect the new crossover piping components.<br />(vii) Provision of all scaffolding, lifting equipment or other as required to carry out the <br />work.<br /><br />D2.4 The Contractor and their Subcontractors shall:<br />(a) Acknowledge the receipt of the Wastewater Services Division (WWSD) Contractor’s Environmental <br />Preservation and Compliance Package by an email to the Project Manager or Contract Administrator.<br />(b) Comply with the Environmental Management Systems (EMS) Contractor’s package of the Wastewater <br />Services Division attached as Appendix E.<br />(c) Deliver EMS awareness training to employees and anyone who will be working on projects for <br />the Wastewater Services Division (WWSD) through formal education, online training interactive <br />training or work experience.<br />(d) Be aware of their obligation as stated in the Wastewater Services Division’s Environmental <br />Policy that provides overall direction for the WWSD’s environmental performance and provides a <br />framework for setting environmental objectives and targets. This policy can be found online <br />through the City of Winnipeg Wastewater Services website:<br />h ttps://www.winnipeg.ca/waterandwaste/sewage/legislation.stm<br />(e) Identify and understand the environmental impacts of your work. Environmental impacts may <br />include, but are not limited to:<br />(i) Depletion of natural resources<br />(ii) Conservation management and biodiversity<br />(iii) Soil contamination<br />(iv) Air emissions and pollution<br />(v) Water pollution<br />(vi) Noise pollution<br />(vii) Spills and releases<br />(viii) Disturbance to local community and fauna<br />(ix) Use of landfill spaces and waste management<br /><br />
Key dates
Response due
March 31, 2023
- Posted
- March 17, 2023
Details
- Buyer
- City of Winnipeg
- Agency
- City of Winnipeg
- Buyer type
- County
- Jurisdiction
- (MB)
- Category
- Administrative
- Value
- —
- Set-aside
- —
- NAICS
- —
- PSC
- —
- Source
- socrata
Who is this buyer
Organization
Source: Provider universeNot matched to a provider record yet.
Buying history
Source: Solicitation records- Records32 total
- Opportunities / awards32 / 0
- ActiveSeptember 23, 2020 – August 11, 2026
What they buy
- Administrative (25)
- Clinical (6)
- Insurance (1)
Financial highlights
Source: IRS Form 990No 990 filing on record.
Who holds their work today
Source: Solicitation records · awardsNo awards on record for this buyer.
What they're trying to solve
Source: AI-generatedNo brief written for this buyer yet.
Also open from this buyer
Source: Solicitation recordsWays to meet this buyer
Source: Solicitation records · event noticesUpcoming
No upcoming events on record.
Source link on socrata.