HRC Ledger

Request for Proposal Consulting Services for Emergency Vehicle Pre-Emption Feasibility Study

NewClosedadministrativeOpportunity
D4. SCOPE OF SERVICESD4.1 The Services required under this Contract shall consist of a benefit analysis and feasibility study of EVP for the City of Winnipeg. The objective is to provide decision makers with a basis on which to assess transportation implications of city-wide EVP implementation and the benefits itmay provide.(a) Describe the existing WFPS system for route selection and assess WFPS experience withexisting hardwired fire hall pre-emption systems in Winnipeg.(b) Using different types of roadway classifications estimate the number of active emergencyvehicles expected per day and quantify the anticipated impacts to traffic including traffic signalcoordination recovery time and queue recovery time.(c) Quantify the time-savings achievable for the WFPS through EVP in Winnipeg.(d) Compile and assess intersection collisions involving emergency vehicles over the past fiveyears. Estimate potential changes in collision frequency with EVP and potential cost savings.(e) Determine if EVP should be implemented at all signal-controlled intersections or is there ahierarchy of priority locations that EVP would be more suited for.(f) Research other similar cities with EVP systems and the benefits and lessons learned fromthose implementations. Include a survey of the type of EVP system used, policies for truncatingtraffic signal phases and pedestrian clearance times. Summarize which vehicle types are using EVP.(g) Provide overview of off-the-shelf EVP solutions that are compatible with the City’s currenttraffic controllers and Signals Traffic Management System (Transparity) software. Include a Class 4 cost estimate for installation per intersection and per emergency vehicle.(h) Provide a cost-benefit analysis for the installation and incorporation of EVP in Winnipegbased on the findings of this study. This should include factors such as collision reduction,time-savings, traffic impacts, EVP system costs, WFPS facility location requirements, and otherfactors as determined by the study.D4.1.1 The Services required under D4.1 shall be in accordance with the City’s ProjectManagement Manual http://winnipeg.ca/infrastructure/asset-management-program/templates-manuals.stm#2 and templates http://winnipeg.ca/infrastructure/asset-management-program/templates-manuals.stm#4 . Notwithstanding the foregoing, the Consultant is being engaged by the City for its professional expertise; the Consultant shall bring to the ProjectManager’s attention any aspect of the City’s Project Management Manual or templates which theConsultant is of the opinion is not consistent with good industry practice.D4.2 Throughout the Project, the Consultant should coordinate with the City’s Project Manager. The City’s Project Manager will be:(a) Kept informed by the Consultant’s Project Manager of progress on a regular basis.(i) Monthly progress meetings will be held.(ii) The Consultant should distribute agendas one (1) week in advance and minutes one(1) week after each progress meeting.(b) Copied on all Project correspondence.(c) Advised of significant problems/issues as they arise, resolution options to be considered,and recommended solutions for consideration and approval by the City prior to implementation.(d) Involved in any meetings with stakeholders, based on the City’s Project Manager’savailability.(e) Advised of any potentially controversial issues as they arise.(f) Advised of any additional work considered, prior to it being completed, beyond the originalscope of services.(g) Consulted prior to any changes being made to the City approved project schedule. The City’sProject Manager shall confirm any schedule changes in writing.The City will establish a Technical Working Group comprised of Winnipeg Fire & Paramedic Services,D4.3 Traffic Signals Branch, and Innovation & Technology staff. Throughout the Project,with the City of Winnipeg’s Technical Working Group.D4.3.1 The City is anticipating an active and involved Technical Working Group for thisProject.D4.3.2 The personnel assigned to the City’s Technical Working Group will be determinedat project kickoff.D4.3.3 The City’s Technical Working Group will be involved in the day-to-day technicalaspects of the Project, specific to their respective disciplines, level of commitment, andavailability. They will be engaged and kept informed of the Project’s progress through:(a) Monthly Technical Working Group meetings to be organized by the consultant and to be held for the duration of the project.(i) The Consultant should distribute agendas one (1) week in advance and minutes one (1) weekafter each Technical Working Group meeting.(b) Circulation of Project documentation for review.(c) Additional consultation and collaboration as needed.D4.4 The Consultant should submit a draft final report to the City by August 12, 2022, for review.(a) The draft report should include the results of all items pertaining to D4.1, as describedabove.(b) The City will complete the review and return the draft final report with comments bySeptember 9, 2022.D4.5 The Consultant should submit a final report for review and approval by the City by September 30, 2022, for review and approval.(a) The final report should include the results of all items pertaining to D4.1, as describedabove.(b) Allow suitable time for City review, comments, and approval of the final report.
Build pursuit package

Key dates

Response due

March 25, 2022

Posted
March 4, 2022

Details

Buyer
City of Winnipeg
Agency
City of Winnipeg
Buyer type
County
Jurisdiction
(MB)
Category
Administrative
Value
Set-aside
NAICS
PSC
Source
socrata

Who is this buyer

City of Winnipeg

Organization

Source: Provider universe

Not matched to a provider record yet.

Buying history

Source: Solicitation records
  • Records61 total
  • Opportunities / awards2 / 0
  • ActiveSeptember 23, 2020 – August 14, 2026

What they buy

  • Administrative (54)
  • Clinical (6)
  • Insurance (1)

Financial highlights

Source: IRS Form 990

No 990 filing on record.

Who holds their work today

Source: Solicitation records · awards

No awards on record for this buyer.

What they're trying to solve

Source: AI-generated

No brief written for this buyer yet.

Also open from this buyer

Source: Solicitation records

Ways to meet this buyer

Source: Solicitation records · event notices

Upcoming

No upcoming events on record.

View source document →

Source link on socrata.

← Back to all contracts